Intro to Stagecraft & Rigging Orientation
Existing 2–3 hour new-hire framework covering safety, terminology, work calls, ropes, hardware, rigging awareness, tools, PPE, and scenarios.
In developmentThis preview shows how existing Academy and venue documents can seed a searchable library, then expand through leadership-approved procedures, technical references, course materials, and system updates.
Existing 2–3 hour new-hire framework covering safety, terminology, work calls, ropes, hardware, rigging awareness, tools, PPE, and scenarios.
In developmentContact, access, house policies, production policies, labor procedures, venue dimensions, equipment, and technical specifications.
Leadership reviewSource plot and technical drawing material that can support lighting-system orientation and approved house documentation.
ControlledLoad documentation for specific structural/PA-beam conditions. Access should be limited to personnel with a legitimate operational need.
RestrictedProduction-specific Vectorworks plot demonstrating how show drawings and archived plots can support instruction and institutional memory.
Archive sourceApproved center operating guidelines, employee information, emergency procedures, departmental SOPs, revision notices, and required acknowledgments.
To be developedEvery operational resource should identify its owner, approver, revision date, audience, access level, superseded versions, and whether acknowledgment or retraining is required. Drafts and historical references must be visually distinct from current approved instruction.